Delta Offshore Technology played a pivotal role in the successful execution of the P.G. Star Refinery Seawater Intake System, delivering management, engineering, load-out, and installation of large-diameter marine pipelines. Developed for the Persian Gulf Star Oil Company, this high-capacity system supplies 200,000 cubic meters of seawater per day for cooling operations at the 360,000 BPSD condensate refinery in Bandar Abbas.
Read more . . .Given the ultra-large diameter (2.7m), heavy steel pipelines, and offshore tie-in complexities, this project posed significant technical and operational challenges. Delta Offshore Technology leveraged its advanced subsea installation expertise to complete all floating, flooding, and offshore tie-in operations within hours—far exceeding client expectations.
Read more . . .By integrating precision engineering, innovative installation techniques, and stringent safety measures, Delta Offshore Technology successfully delivered this critical infrastructure. Recognized for its technical excellence, this project was featured at the 24th International Offshore (Ocean) and Polar Engineering Conference (ISOPE) in 2014.
A 360,000 BPSD condensate refinery in Bandar Abbas has been carried out by Persian Gulf Star
Oil Company, where a seawater intake system was designed to supply 200,000 cubic meters
clean water from 1500m offshore by 4 x 2.7m diameter steel marine pipelines for cooling
purposes.
Found out more
Read more . . .
Hence, seawater would be collected at the basin through four steel pipes of 2.7m
inner diameter and 22mm thickness which were connected together as a 600m string.
The length of the pipeline route is approximately 1.4 km, including two strings of 600
meters and shore approach line of 130 m.
Read more . . .
Although, this was a huge and a high-risk project due to the
pipeline’s material and its ultra-large dimensions, it was carried out with the most safety
and reliability. All activities related to floating and flooding (subsea installation),
including offshore tie-ins between two individual strings has successfully completed by
Delta offshore Technology in just a few hours that was much less than as the client expected
Delta Offshore Technology executed the pipeline management, engineering and installation activities, ensuring the project was completed with precision and efficiency. Key tasks included:
Found out more Read more . . .Delta Offshore Technology delivered this project with precision and efficiency, overcoming the challenges posed by the prior contractor’s failed installations. The successful installation of the storm and outfall pipelines ensures the safe and reliable operation of the South Pars Phase 22 and 24 facilities. Read more . . . This project demonstrates Delta Offshore Technology’s capability to deliver high-quality solutions and its commitment to addressing complex challenges in marine pipeline construction.